top of page
OPT_03_10.jpg
OPT_03_11.jpg
OPT_03_08.jpg
OPT_03_06.jpg
OPT_01_11.jpg
OPT_01_10.jpg
OPT_01_08.jpg
OPT_01_06.jpg
Untitled-1.jpg
Pasar Rakyat Entrance
Pasar Rakyat Entrance
Day Lights Study
Form Study
Form Study
Maluri-Entrance
Maluri-Entrance
Maluri-Entrance

KLANG VALLEY MASS RAPID TRANSIT SBK LINE 01

2010-2012 (Design Development)

Designation as Design Architect

Neuformation Architects Sdn Bhd

 

Client

MRT Corporation Sdn Bhd

MMC -Gamuda

Assigned to develop and designing the 7 Stations of KVMRT projects included 3 Underground stations and 4 Elevated stations. The concept was to create the icon building with the deep thought sculpture design ideas.

 

Therefore, as designer im trying to make it as functional as they are beautiful, the seven KVMRT will be both transportation hubs and community landmarks. Whereby each station features with Simple, attractive design, Intuitive passenger flows, Inviting and safe public spaces, Integration with pedestrian pathways, Accessibility best practices, Public art showcases, Extensive features for cyclists, walking pathways along the road

 

 

 

 

bottom of page